McKinney, TX Roofing Codes

McKinney, TX follows the 2015 IBC codes and the 2015 IRC.

Items that the City Requires are below.
Max number of layers: 2 (IRC R907.3)
reroof with shakes: Yes
Ice and water required: No
Rake or Eave metal required: No
Rolled roofing allowed: down to 1/12 (IRC R905.5.1)
Felt: double layer required between 2/12 and 4/12 (IRC 905.2.2)
Cricket required for chimney 30" and over: Yes (IRC 903.2.2)


Link to ICC for McKinney, TX IRC code book (Click Here)
Link to McKinney,TX requiring 2015 IBC/IRC code requirements. (Click Here)

This page has been seen 223 times.

Users Browsing This Page (0 members, 1 guests)